Pink-Tile Bathroom Modernization – Germantown, MD | Think2Remodel
Home Gallery Germantown, MD
After — modern white bathroom in Germantown, MD
Before — mid-century pink tile bathroom in Germantown, MD
Before
After
Project Overview
Germantown, MD
Clean / Modern
Bathroom Remodel

Before & After
Bathroom Modernization – Germantown, MD

This before-and-after bathroom modernization in Germantown, MD finally retired the famous mid-century pink tile — replaced with a clean white bath, glass walk-in shower, and matte black fixtures.

Pink tile covered every wall of the original bath, along with a dated tub and zero storage. The new room is bright, simple, and built with materials that will not date themselves.

Beneath the new finishes, the bathroom received the same full mechanical update as every project we do — electrical, plumbing, and ventilation to current code.

Handled start to finish by Think2Remodel, a licensed Montgomery County contractor (MHIC #159517).

Planning something similar? See our bathroom remodeling services, browse more work in Germantown, or get a free quote.

What was done
Pink Tile Removal & Rebuild – Germantown, MD

Every square inch of pink tile came out, walls were re-boarded with proper backer, and the room was rebuilt watertight.

Quartz Walk-In Glass Shower – Bathroom Remodel MD

A glass-enclosed walk-in shower with large-format white tile replaced the old tub — cleaner lines and easier access.

White Vanity with Quartz Top – Montgomery County Bathroom

A white vanity with drawers and a quartz top adds real storage where a wall-hung sink used to be.

Matte Black Fixtures – Bathroom Modernization

Matte black faucet, shower set, towel bars, and mirror frame give the white room crisp definition.

Brass Hardware & Pendant Lighting – Germantown Kitchen

A backlit LED mirror and recessed ceiling light replaced a single bulb strip — double the light, none of the glare.

Plumbing & Ventilation Update – Licensed Contractor MD

New valves, supplies, and a quiet exhaust fan, all brought to current code during the rebuild.

Client review
"Sixty years of pink tile, gone in a week. The new bathroom is so bright and easy to clean. They sealed off the hallway, vacuumed daily, and finished two days early."
DJ
Derek J.Germantown, MD · Complete Full Bath Remodel

Project Details

LocationGermantown, MD
Project typeFull Bath Remodel
StyleClean / Modern
Size~50 sq ft
Timeline3–4 weeks
LicenseMHIC #159517

Includes

Walk-In ShowerWhite VanityQuartz TopMatte Black FixturesLED MirrorLarge-Format TileExhaust FanPainting

Want a bathroom like this?

Think2Remodel serves Bethesda, Rockville, Potomac, Gaithersburg, and all of Montgomery County, MD.

Get a Free Quote (240) 258-8885
Licensed Contractor
MHIC #159517
Maryland Home Improvement Commission